Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

CAPITAL PROGRAM MANAGEMENT 

Image Removed

Image Added

Image Added

Image Removed
Image Added

CONCEPT VIEWS


Currently, the Triton Pavilion project is finalizing the Detailed Project Program (DPP) and is in Schematic Design, which is the first phase of the architectural design process.  In this step, the architect works with the client to determine the project requirements and goals. The architect produces concept drawings that illustrate the basic concepts of the design, including spatial relationships, basic scale, and forms. 

After the completion of Schematic Design, pending Regents' approval, the project will move into the Design Development phase, followed by the Construction Documents phase.



These concept views indicate what the experience of approaching or being in Triton Pavilion plaza might feel like, but the buildings and materials are not final - these will change as the design continues to develop.



Space Allocation Diagram

Image RemovedImage Added


Image RemovedImage Added
HOME 583106776      ABOUT  ABOUT      GALLERY          RESOURCES         FAQS        CALENDAR         TIMELINE        CONTACT
HTML Comment<style type="text/css"> #likes-section{display:none !important;} </style>